Customer outcomes

Energy savings stories written with operational specificity.

Strong use cases show the building type, operating constraint, and measured outcome.

Northbridge University campus energy case study
Campus18 buildings

Northbridge University

Found overnight air-handler waste after occupancy schedules changed across lecture halls and labs.

  • 21% reduction in overnight HVAC load
  • $312K projected annual savings
  • 6-week payback window
Arden Hotels demand response case study
HospitalityPeak demand

Arden Hotels

Shifted pre-cooling and laundry loads during high-occupancy heat events without lowering guest comfort.

  • 14.7% lower summer peak demand
  • 92% comfort score maintained
  • 4 properties connected first
Meridian Freight logistics center energy case study
LogisticsSolar

Meridian Freight

Coordinated refrigeration, dock schedules, and solar production across regional warehouse sites.

  • 11 sites benchmarked
  • 18.2% reduced grid draw at peak
  • 7 recurring faults resolved
Healthcare campus building energy case study
HealthcareComfort risk

HelioCare Properties

Separated true mechanical drift from patient-volume changes across outpatient buildings.

  • $1.1M recoverable spend modeled
  • 39 comfort-risk alerts prioritized
  • Finance reporting automated
Mixed-use building dashboard case study
Mixed-useTariff modeling

Westhaven District

Modeled new tariff exposure for office, retail, and residential meters before a rate transition.

  • 3 tariff scenarios compared
  • 8 meters reclassified
  • Budget variance reduced
Regional building portfolio optimization case study
PortfolioBenchmarking

Cobalt Asset Group

Ranked 44 buildings by weather-adjusted savings opportunity before annual capex planning.

  • 44 sites modeled
  • 12 vendors routed work
  • Capex planning accelerated

Proof path

Turn your own data into a case study.

The contact page is set up to capture portfolio size, data readiness, and the energy problem a prospect wants to solve.